Crane system
Cranes on the chain - Energy supply system in heavy duty use since 12 years.
Główne zalety dla budowniczych i użytkowników dźwigów:
Cranes on the chain - Energy supply system in heavy duty use since 12 years.
In the crane system, the requirements on the operating safety are especially high due to the long travels. Expensive shut downs and downtimes must be avoided in any case.
In crane construction, energy supply systems frequently prove their technical and economic strengths. Flexibility, variability and a space-saving installation are only some of the most important criteria.
Energy supply systems for shipyard cranes successfully in operation since six years.
Thanks to the construction with e-chains® in the thermal spas in Bad Wörishofen, about 100 meters of cable could be saved and the weight of the roof was reduced.
e-chain system® for a coal unloader. Operating since three years without any problem.
Extremely difficult conditions: Dirt and dust, heavy filling, long travel and high temperatures. The system functions since 2003.
Zastosowanie systemów e-chain® w rozładowarce statków
Since the ship loader started operations in 2000, no troubles, either mechanical or in the cables, have occurred in the energy chain area.
Dzięki temu dokładnie zaprojektowanemu systemowi zasilania energią, gabaryty montazowe zostały znacząco zmniejszone.
Ta suwnica w montowni ciężarówek jest wykorzystywana do rozładunku i transportu zawieszenia we wczesnym etapie montażu.
In contrast to metal and bronze bearings, the igus® bearings do not corrode due to their high-performance polymer structure and are for this reason the ideal choice for underwater application.
The energy chain employed in 2000 runs smoothly.
Outdoor cranes must withstand harsh weather conditions. Indoor cranes also work under alternating moisture influences with simultaneous extremely high temperatures.
Energy and signal supply to the container cranes at the HHLA Container Terminal Altenwerder - twelve trouble-free years
The portal crane “Goliath” is used for shipbuilding. Problematic was the cable management.
Changed crane supply on an installation vessel: An XXL energy chain with a rearward bending radius shall ensure the power and signal supply as an alternative to a slip ring.
Applications with: RTGs, RMGs, STS, bulk handling cranes, manlift STS cranes, spreader, reach stackers, shipyard cranes, indoor cranes
Od poniedziałku do piątku od 7:00 do 20:00.Soboty od 8:00 do 12:00.
24h